Water Breakthrough Challenge Catalyst Stream
Approximately £8 million is available.
Individual entries can bid for £150,000 – £2 million.
Entries closed on 8 December 2022 at 12 noon (GMT).
Water Breakthrough Challenge Transform Stream
Approximately £30 million is available.
Individual entries can bid for £2 million – £10 million. Subject to certain conditions, Ofwat are open to accepting entries requesting greater than £10 million.
The stage 1 entry period closed on 9 November 2022 at 12 Noon (GMT).